Basement Construction Hilton Birmingham

The new Hilton Hotel in Birmingham were given approx. 3000 square feet of useable space under the old factory which they wanted to use to create a large gymnasium, kitchens and administration offices for the whole Hilton Hotel Chain in the UK.

 

As you can see from the images this is a very large commercial space and extensive design and planning were carried out in achieve a complete waterproofing solution for the basement. Cavity drain waterproofing membranes were used with an extensive sewage system in order to pump the waste water back up to drain level. In addition to this the basement space required a proper ventilation system to ensure that there was a supply of fresh, clean air being provided.  

 

Although the entire project took over a year to complete from start to finish, the actual waterproofing part was completed in just 2 weeks which then enabled the contractors to start outing in place the basement finishes.

 

The work was completed by our approved contractors Site Sealants of Falkirk. Dennis at Site Sealants experience in this field is second to none.

 

If you are interested in a basement conversion then contact us today and have a chat with one of our expert team on 08454006666.


Warning: file_put_contents(/home/basement/public_html/files/cache/pages/c/a/s/case-studies%2Fbasement-construction-hilton-birmingham.cache): failed to open stream: Permission denied in /home/basement/public_html/concrete/core/libraries/page_cache/types/file.php on line 67